We can advise on regulatory requirements concerning airspace, obstacles, and other associated matters. We are also available to present expert evidence at resource consent hearings and Environment Court appeals.
A selection of relevant projects includes:
Obstacle Limitation Surfaces
- Independent advice to Auckland Council regarding the obstacle limitation surface associated with Auckland International Airport Ltd’s proposed second runway;
- Advice to the NZDF on obstacle limitation surfaces at two air bases;
- Design of a multi-pad heliport to comply with AC139-8 Aerodrome Design: Heliports;
- Advice to a water supply company concerning trees infringing an obstacle limitation surface;
- Evidence in a resource consent application regarding the construction of water supply tanks adjacent to an airstrip, with infringement of obstacle limitation surfaces being a significant issue;
Evidence in Resource Consent applications and hearings
- Evidence in resource consent applications concerning two proposed heliports;
- Evidence in a resource consent application regarding the construction of water supply tanks adjacent to an airstrip;
- Evidence in a resource consent application concerning the safety of an existing helipad;
Regulatory Approvals
- Preparation of Part 77 notices for construction adjacent to a rural airstrip
- Preparation of Part 157 notices for construction of a heliport
|
|